Suspend a Kubernetes CronJob during an outage

Scaling cannot express “do not start the nightly backup tonight”. A CronJob has no replica count to hold at zero — it has a schedule, and at 02:00 it will create a Job whatever the rest of the cluster is doing.

That is the single highest-value thing to stop during a power cut or on a metered uplink, and it is one field: spec.suspend.

  • Reactor is installed and ReadyInstall.
  • The CronJob exists. Reactor never creates one.
  • It is in a namespace Reactor can reach. A target in a different namespace from the Automation needs rbac.clusterWide (the default); with it false, an Automation can only target its own namespace.
  • The state key you match on is published — ups* only with a UniFi UPS adopted, wan/internet only with a gateway. See State keys.

Stop the backup while the rack is on battery

Section titled “Stop the backup while the rack is on battery”
apiVersion: reactor.robbeverhelst.com/v1alpha1
kind: Automation
metadata:
name: hold-backups-on-battery
namespace: velero
spec:
when:
provider: unifi
state:
ups: on-battery
actions:
- type: kubernetes.cronjob.suspend
target: { kind: CronJob, name: velero-backup, namespace: velero }

That is complete. suspended defaults to true — it is what the action is named after — and with onExit omitted the reversal policy is Baseline: Reactor recorded whether the CronJob was suspended before it first claimed it, in reactor.robbeverhelst.com/baseline-suspend on the CronJob itself, and restores exactly that.

That default matters here more than it looks. If you had suspended the backup by hand last Tuesday and forgotten, the baseline is true and Reactor leaves it suspended when the power comes back, rather than quietly starting a job you had switched off.

If you would rather say it out loud:

onExit:
- type: kubernetes.cronjob.suspend
target: { kind: CronJob, name: velero-backup, namespace: velero }
suspended: false

Now the CronJob is unsuspended on the way out regardless of what it was — which is the right choice when the schedule matters more than the manual override, and the wrong one if anybody ever pauses it by hand.

Section titled “For an offsite backup, match the uplink instead”

A backup that ships to S3 has a different failure mode: the rack has power, the uplink is the metered one, and a 400GB sync is about to leave over 5G.

apiVersion: reactor.robbeverhelst.com/v1alpha1
kind: Automation
metadata:
name: hold-offsite-sync-on-backup-wan
namespace: backup
spec:
when:
provider: unifi
state:
wan: backup
actions:
- type: kubernetes.cronjob.suspend
target: { kind: CronJob, name: restic-offsite }

Omitting namespace on the target means the Automation’s own namespace, which is the common case and needs no cluster-wide RBAC.

Suspending stops new Jobs, and nothing else

Section titled “Suspending stops new Jobs, and nothing else”

A Job already running keeps running. Suspending sets spec.suspend on the CronJob, which stops the controller creating more Jobs; it does not touch, evict or delete the one that started at 01:59.

That is deliberate, and it is enforced rather than promised: Reactor is granted no permission over jobs at all, so it could not delete one if it wanted to. Declining to start more work is a very different act from killing work in flight, and killing work in flight is not a decision an outage should take on your behalf. If a running backup is what needs stopping, stop it yourself.

Unsuspending does not run what was missed. The CronJob controller does not catch up on schedules that passed while it was suspended (subject to the CronJob’s own startingDeadlineSeconds). A four-hour outage means the 02:00 backup did not happen, not that it happens at 06:00.

Terminal window
kubectl -n velero describe automation hold-backups-on-battery
Type Reason Age From Message
---- ------ ---- ---- -------
Normal StateEntered 15s automation ups moved from "online" to "on-battery", so the condition started holding
Normal TargetHeld 15s automation CronJob/velero/velero-backup held at suspended

The level is reported in words rather than as a number, because a bare 0 stops explaining itself once a target’s level is a switch rather than a count:

Terminal window
kubectl -n velero get automation hold-backups-on-battery -o jsonpath='{.status.targets[0]}'
# {"ref":"CronJob/velero/velero-backup","desired":0,"effective":0,"level":"suspended"}

Underneath, it is an ordinary kubectl change with an ordinary audit trail:

Terminal window
kubectl -n velero get cronjob velero-backup
# NAME SCHEDULE TIMEZONE SUSPEND ACTIVE LAST SCHEDULE AGE
# velero-backup 0 2 * * * <none> True 0 14h 97d
kubectl -n velero get cronjob velero-backup -o jsonpath='{.metadata.annotations}'
# {"reactor.robbeverhelst.com/baseline-suspend":"false",
# "reactor.robbeverhelst.com/claimed-by":"velero/hold-backups-on-battery",
# "reactor.robbeverhelst.com/claimed-at":"2026-08-15T02:40:11Z"}

And on the way back:

Normal StateExited 6s automation ups moved from "on-battery" to "online", so the condition stopped holding
Normal TargetReleased 6s automation CronJob/velero/velero-backup released; no automation claims it any more

Suspending is a desired-state action, so it is arbitrated exactly as scaling is. Point one Automation at the backup for ups: on-battery and another at the same backup for wan: backup, and the CronJob stays suspended while either condition holds, coming back only when neither does. Nothing has to be coordinated, and the one that is currently outvoted says so:

Terminal window
kubectl -n velero get automation hold-backups-on-battery -o jsonpath='{.status.targets[0]}'
# {"ref":"CronJob/velero/velero-backup","desired":1,"effective":0,"level":"suspended",
# "deferredBy":["backup/hold-offsite-sync-on-backup-wan"]}

Applied=False with reason DeferredToOtherAutomation is not a fault, and the Event for it is Normal. Being outvoted by a more restrictive claim is how two Automations sharing a target are meant to behave. Arbitration has the whole model.

One thing to avoid: if both Automations write an explicit onExit, make them agree. Two Automations declaring different levels for one target once nothing claims it cannot both be right — a CronJob has one normal setting — so Reactor takes the most restrictive, and raises a ReversalDisagreement Warning naming both specs so somebody can fix one. It is raised while the disagreement exists rather than at release, because the point of knowing is finding out before the outage ends. Reversal and baselines.

  • Not Jobs. No permission, on purpose. See above.
  • Not the workloads the job talks to. Suspending the backup CronJob does not scale down the database it dumps — that is a separate action.
  • Not schedules outside Kubernetes. A cron entry on a NAS is invisible to Reactor. A notification.* or an http.request is the reach it has there.
  • Not a Job that is already Pending for other reasons. Suspension is about creation, not scheduling.
  • No kubernetes.drain. Deliberately not implemented — an eviction cannot be un-evicted, so it has no level to arbitrate and no reversal to declare. The four reasons.